Difference between revisions of "August 3 2021 - Facilities"
From MakeICT Wiki
Jump to navigationJump to searchSteve Owens (talk | contribs) |
Brad Cozine (talk | contribs) m (Text replacement - "Ralph" to "Saga") |
||
Line 8: | Line 8: | ||
*Joe Birzer | *Joe Birzer | ||
*Steve Owens | *Steve Owens | ||
− | * | + | *Saga Romig |
*Wes Timmerman | *Wes Timmerman | ||
Line 21: | Line 21: | ||
**No update. We did have a few small limbs come down in the past few weeks. | **No update. We did have a few small limbs come down in the past few weeks. | ||
*Roof | *Roof | ||
− | ** | + | **Saga is still waiting on calls with the contractors. |
*Textiles Drier lint trap | *Textiles Drier lint trap | ||
**No update | **No update | ||
Line 33: | Line 33: | ||
*LED lights | *LED lights | ||
**No update | **No update | ||
− | ** | + | **Saga has been in contact with a friend for advice. |
*Print Shop walls | *Print Shop walls | ||
**Shelving has been installed, and walls have been framed. Will look into using choir panels for backing shelves. | **Shelving has been installed, and walls have been framed. Will look into using choir panels for backing shelves. |
Latest revision as of 10:02, 9 June 2022
Contents
AGENDA
Roll Call
Committee Members
- Joe Birzer
- Steve Owens
- Saga Romig
- Wes Timmerman
Members
- Domy Rivo
- Dean Day
Old Business
- Water entering the tunnels
- Nothing new to report, but noted that in the last major rain we had a good stream coming out of the West tunnel.
- Oak Tree in the front
- No update. We did have a few small limbs come down in the past few weeks.
- Roof
- Saga is still waiting on calls with the contractors.
- Textiles Drier lint trap
- No update
- Mowing
- Seems to be getting done fine. Will continue to monitor.
- Fence vegetation
- Still need to follow-up with Aaron Rivers.
- Welcome Center Countertop
- Painted and ready to epoxy. Sample is displayed.
- Need decision on logo.
- LED lights
- No update
- Saga has been in contact with a friend for advice.
- Print Shop walls
- Shelving has been installed, and walls have been framed. Will look into using choir panels for backing shelves.
- Task list spreadsheet
- Steve still needs to look into setting up a sharable sheet.
- Also considering putting up a whiteboard for signups.
- Window AC Units
- Joe has installed first unit in Classroom 1. Will work on Classroom 3 using the 14000 BTU unit purchased from Craig's list
- Need plan for power.
New Business
- Door to South Hall Chase
- Doorknob does not function so it seems like it is always locked, even though it isn't.
- Door Closers
- Joe plans on getting back to work on this sometime in the future.
- We have all of the hardware required.
- Foundry Committee
- Dean reported on the plans for a new Foundry Committee. They will be presenting to the board soon.
- We need to verify if we need to be involved in discussions with the insurance provider.
Next Meeting
- September 7rd at 6:30 PM