Difference between revisions of "September 28 2019 Planning Meeting"
From MakeICT Wiki
Jump to navigationJump to searchLine 4: | Line 4: | ||
== Roll Call == | == Roll Call == | ||
=== Members === | === Members === | ||
− | James Lancaster | + | *James Lancaster |
− | Davis Springs | + | *Davis Springs |
− | Ladeana Dockery | + | *Ladeana Dockery |
− | Kevin Bumgarner | + | *Kevin Bumgarner |
− | Alysa Bumgarner | + | *Alysa Bumgarner |
− | Patrick Hutchinson | + | *Patrick Hutchinson |
− | Jason P | + | *Jason P |
− | Cathy Bowman | + | *Cathy Bowman |
− | Michelle Lefavor | + | *Michelle Lefavor |
− | Paula Pankratz | + | *Paula Pankratz |
− | Allan Bacon | + | *Allan Bacon |
− | Mike Clough | + | *Mike Clough |
− | Malissa Long | + | *Malissa Long |
− | Logan Pajunen | + | *Logan Pajunen |
− | Rustin Atkeisson | + | *Rustin Atkeisson |
===General Build Prep Issues=== | ===General Build Prep Issues=== |
Latest revision as of 20:18, 28 September 2019
2019 September 28 Building Planning meeting minutes
AGENDA
Roll Call
Members
- James Lancaster
- Davis Springs
- Ladeana Dockery
- Kevin Bumgarner
- Alysa Bumgarner
- Patrick Hutchinson
- Jason P
- Cathy Bowman
- Michelle Lefavor
- Paula Pankratz
- Allan Bacon
- Mike Clough
- Malissa Long
- Logan Pajunen
- Rustin Atkeisson
General Build Prep Issues
- Need to have communication problems taken care of
- Need to have groups talking together better
Building Prep
- Looking at getting some carts to help with move and might be kept permanently in Room 2
- Build would be in Phases
- Lounge might go into Room 5
- Not calling the kitchen/office what they are now
- Will not knock down walls due to cost, fire prevention, other issues
- There is some asbestos in the building, but has been remediated by the school system for the most part
- We will test areas that we are concerned with to be on the safe side.
- Malissa is willing to help run cables
- In a later phase, Room 6 might be redone to handle auto mechanics
- Considered portable eyewash stations
- Has long term maintenance and insurance issues
- Permanent eyewash stations turn out to be cheaper in the long run
- Might have a lead on a previously installed eye wash station
- Electrical
- 1500 Douglas is run off 2x 100A panels ERP and Woodshop
- Plasma cutter and A/C are both run off of the front 100 amp panel
- New location has 400A main service panel
- To have a commercial service run power to all the major equipment might be around $7k with the woodshop/metalshop/FabLab would be right up against the boiler room
- Electrical is looking to be the biggest expense of the build
- 1500 Douglas is run off 2x 100A panels ERP and Woodshop
- HVAC
- Some rooms already have HVAC
- Already applied for grants to get mini-split HVAC units
- Room 1 has HVAC, but needs to be redone (mold)
- Security
- Do have people checking on the place at random times
- Are having more and more people working on the building
- Community Garden
- Would have to drill a well
- Might be able to borrow the well drilling equipment to do this
- Might have to talk with Jens since current plotting shows a road going along the creek side of the property
- Have several grants we can apply for.
- Should also look at grey water reclimation
- Phase 0
- Stuff that absolutely has to be done before we can move in per Zoning and Insurance requirements
- Like fixing the bathrooms
- Phase 1
- Make North Doors usable again
- Office area might be used as storage (kinda like admin closet), also security stuff
- Currently trying to use that office area for admin stuff
- Room 6 Current Facility/Maintenance area might also be used for storage
- Room 7 might be turned ERP (currently used for storing garage sale stuff)
- Might also be used for storage
- Room 9 might also be used for ceramics along with the Boys Bathroom
- Would have to run clay traps on sinks
- Currently the bathroom is a major concern with the insurance company, needs to be dealt with in short order
- Would add an external doorway if money allows
- Room 8 would be a print shop and textiles and would include West Bathroom for a wet studio and washout station
- Room 10 would be Fablab - would make it easier to vent the laser cutters
- Also has 220v outlet (might be a cost-saving)
- might move over the CNC equipment from the ERP and/or possibly the shopbot or tormach
- Room 11 and 13 would be the wood shop.
- Possible knock out the wall between the rooms. If it is not financially possible, they may stay seperate rooms
- Room 12 and 14 would be two separate rooms for the metal shop (clean room and a dirty room)
- clean area might include jewelry lab
- makes it easy to get access to the courtyard for a future Phase 2 blacksmithing/foundry area
- Community garden would be in the courtyard area
- Paint booth location has not been figured out but is considered a higher hazard level due to EPA issues
- Phase 2
- Might include door access control to each room to track how often spaces are really being used
- Door access might eventually be tied to A/C control
- Door access needs to be a universal system
- Would put door passes first on areas of higher security concern
- How this is helpful: woodshop is often left at 68F when no one is around
- Outdoor casting firing Ceramics and Metal get a permit for fire pit would be needed