July 17, 2025

From MakeICT Wiki
Jump to navigationJump to search


Facilities 17th July - Electrical and Mechanical Discussion

Attendees

  • Jaipal Chauhan
  • Aaron Grindstaff
  • Andy Tannahill
  • Dean Day
  • Christian Kindel
  • Preston Warden
  • James Lancaster
  • Rustin Atkeisson
  • Gretchen Koch
  • Beth Shook

State of the Makerspace

  • Current Power
    • Peak Power usage: 43kVa (July 2024)
    • Last month (June 2025): 41kVa
    • Max the transformer can handle 75kva
    • Already have report of how much power is being used when since moving into the building
    • Might work on an API for a visual display of how much power is being used
    • Have started the process of finding bids
  • To keep moving forward with trying to get bids, the following is needed:
    • Dimensioned plan of space (there is one on the drive)
    • photographs of attic space as well as the model and serial numbers of the furnace units in the attic
    • highly desired to get pictures of plenums (current flexible ducts are not very efficient at moving cold air)
    • this information is needed by Jai

Steps to Making the MakerSpace Cooler (thermally)

  • Mechanical (HVAC) is needed to figure out size of electrical components
    • Jai is reaching out to Mechanical companies to determine electrical needs
    • Ask members to reach out to him if they want to help and not to reach out to companies without talking to Jai FIRST
    • Will reach out to electrical contractors after electrical needs are established
    • Do have a couple of members that work for electrical companies that could help, but again, ask that they coordinate directly with Jai
  • Order of implementation (probably can’t afford to do everything at the same time)
    • What would get implemented?
    • Priority goes first to what we HAVE, then NEED, then WANT
  • Will most likely take a major change to existing electrical infrastructure
    • Current switching panel limited to 400a
    • Evergy would take responsibility for replacing the transformer based on our need (not just because we want a new one)
    • Have considered putting in a new main 1200a switch and gotten a couple bids (all would daisy chain the existing panel off of it)
    • Other option is a Big exterior panel that feeds other sub panel

What flexibility needs to be considered before implementation?

  • Only areas that could move in the future (take little for electrical changes)
    • Textiles
    • Electronics
    • Visual Arts/Stained glass (would want to add plumbing, might need a lift pump for waste water)
    • Screen Printing (would want to add plumbing, might need a lift pump for waste water)
  • All areas that need to stay in fire rated areas:
    • Wood Shop
    • Metal shop
    • Jewelry
  • Questionable fire rating needs?
    • CNC machines for metalshop (could they be moved to a non-fire rated area?)

What needs to happen to add more power?

  • How to expand?
    • switching equipment upsizing (currently setup for 400a)
    • adding a separate switch for the classroom hall
  • What about the transformer?
    • not our responsibility to replace
    • is replaced by Evergy based on what our contractor provides
    • requires that the pad under the new unit is level, free of voids, not cracked (ours is cracked)
  • Would everything be done at once?
    • Possible do each wing separately (might cost more overall, but would make it possible to get something done sooner)
    • Can likely do one wing without swapping the transformer
    • Would most likely need to take out a loan to incorporate
  • A/C Units
    • For classroom wing, could add a pair of 5 ton A/C units instead of more individual window units
      • Already have 1 A/C unit for the hall
      • Would run the coolant lines through the chase between the bathrooms to the attic units
      • Need about 22tons of cooling for hall, so the window units may still be needed as supplemental units (the J-calcs have been run multiple times by multiple members)
    • Possibly add a pair of 5 ton AC units to the other wing as well
    • Adding window A/Cs are time consuming for members and may not be the best use of funds or effort
    • Would need to pour a pad and put up a fence around the 5 ton units
  • Other cooling considerations
    • Consider adding motion sensors to run exhaust in bathrooms (currently run by a switch in the chase)
    • Potentially utilize exhaust fans in the attic?
      • Concept works in residential due to surface areas of attics
      • Not sure how effective that would be with how small the attic space is
      • There is an existing axial fan on the west end that we could run a power cord to and test the effectiveness

If we can't afford to cool the entire building, how should we cool the building?

  • Should we have an away temp and then an occupancy temp?
    • Didn’t seem like anyone was opposed to having an away temp around 78 or 80 F
    • Would still like to conserve energy if there are areas not being used constantly
    • James is working on tying the current smart units to the calendar as well as possibly creating a scannable QR code where someone could turn the AC on for a set amount of time
  • What can members do now?
    • Anyone is welcome to a knock out a scope of expandability
    • Jai likes the idea of an electrical sub committee and requests that he be the one that contacts and works with Evergy
    • Could use some help digging into business reimbursements through Evergy and other entitities for improving the efficiency of our a/c system

How will this be funded?

  • We most likely won’t have enough funds free to pay for everything outright
    • Would like to avoid taking out a loan
    • Aaron is working on getting grants and funding
    • Current grants often require the recipient to already have invested in a project and tends to turn into a function of what has been spent
    • Rustin and Preston are running some other avenues for funding
    • Please contact Aaron Grindstaff if you want to help find funding for this project

What other changes to infrastructure are being considered?

  • Suggested smaller electrical changes that could be done in the mean time
    • add more 220v service for hot shop (30a for green air compressor, 3phase for green oven)
    • add circuit for dust collector in woodshop
    • add circuit in room 2 for another AC unit and PCs
    • add circuit in lounge for AC
    • remove Deckel copy mill
    • swap AC in fablab for the new one sitting in maintenance
    • Future Greenhouse – might need something for a ventilation fan and lighting (potential to go solar)
    • add a designated built in Cooling unit for the server room

Next Meeting

  • TBD (Not officially set)
  • When will the next electrical/mechanical meeting be?:
    • after Jai gets bids on mechanical
    • might be a couple weeks