Difference between revisions of "August 17th 2023"
From MakeICT Wiki
Jump to navigationJump to search (→Board Positions: Edited "At-Large" line to read: "If appointed from existing board members, open positions would still need to be resolved.") |
|||
Line 15: | Line 15: | ||
===Members=== | ===Members=== | ||
+ | *Sam Richardson | ||
+ | *Serena Oden-Powers | ||
+ | *Mike Barushok | ||
+ | *Dean Day | ||
+ | *Sherry Ibrahim | ||
===Mission Statement=== | ===Mission Statement=== |
Revision as of 23:07, 17 August 2023
Contents
AGENDA
Attendance
Board Members
- Rustin Atkeisson, President
- Aaron Rivers, Vice President
- TBD, Treasurer
- TBD, Secretary
- James Lancaster, At-Large
- LaDeana Dockery, At-Large
- Gretchen Koch, At-Large
- Michael Atherton, At-Large
Absent
Members
- Sam Richardson
- Serena Oden-Powers
- Mike Barushok
- Dean Day
- Sherry Ibrahim
Mission Statement
- MakeICT is a 501(c)(3) charitable organization and is operated entirely by volunteers. It’s our mission to innovate, learn, and build community at the intersection of art, technology, science, and culture.
Thanks and Recognition
- All the new leads for stepping up to the plate and doing an amazing job!
- LaDeana and Malissa for their continued efforts to keep up with fundraising!
Old Business
Surplus Auction
- We still have a couple of items in room 2 to move.
- Should the items be pitched at this point?
MakerFair - Exploration Place
- Rustin and John Harrison have been asked to lead up the "tinker corner" of maker fair this year.
- Exploration Place came out to MakeICT on 7/10 to talk with members about how they can get involved.
- Will most likely have three booths representing MakeICT, and might include demos making:
- Foam hats
- Painted rocks
- LED stickers
Roof Funding
- Construction to begin mid-September, to be completed by start of October.
- Payment is not due until construction is complete.
- Need to raise $38,000 to keep from digging into reserves.
- Currently raised: $500
- Have two grants in the works, but neither will pay before September.
New Business
Treasurer’s Report
Income $ , above or below budget Utilities insight Instructor pay $ Shop expenses $ Total expenses $ , above or below budget Positive or negative for the month
- Please donate to the roof fund*
Approval of Previous Minutes
- 6/29/2023 Minutes: https://wiki.makeict.org/wiki/June_29th_2023
- 7/20/2023 Minutes: https://wiki.makeict.org/wiki/July_20th_2023
Open Positions / Lead Changes
- Several positions have recently been vacated and we need to find people willing to support these positions
- Positions include and suggested leads
- Visual Arts - (Kim Nguyen interim)
- Textiles - June Huie, as lead & Rayna Fisher, as co-lead
- Jewelry - (Michael Atherton interim)
- Communications -
- Fundraising -
- Inventory -
Board Positions
- Two Open Positions - Secretary, Treasurer
- Rustin and James are handling the Treasury work.
- Gretchen is helping with the Secretary role.
- Aaron Rivers won the election for VP.
- Should the other positions be elected or appointed?
- If appointed from existing board members, open positions would still need to be resolved.
- Sherry is interested in being Treasurer for the remainder of the term.
- Gretchen is interested in being Secretary for the remainder of the term.
Policy Update - Building Access Policy
- Current policy does not cover the outdoor area of the makerspace.
- Proposed change: https://docs.google.com/document/d/1tBEEEz5z66uAF2udLm2fNTH7P_MWy1cGIhGlE_KWvNg/edit?usp=sharing
How to Contact Board Members or Other Leads
- Through the years, different boards have had different preferences on how they are contacted.
- The past years there has been a preference for Facebook or text.
- The current preference is by the appropriate email:
- directors@makeict.org
- metalshop@makeict.org
- woodshop@makeict.org
- info@makeict.org
- etc
Dispute Resolution Committee
- Requesting to change their name (previously Code of Conduct Reporting Committee) to something less confusing - Dispute Resolution Committee (DRC)
- Presenting recommendations to the board.
**May require executive session
Committee Reports
Garden Area
- Would like a hydrant added to the garden area
- Majority of funds in garden were spent at the start of the year
- Do not have a current exact estimate for cost, but current cost would require a 3rd party to dig under utilities
- Ballpark cost would be about $1500.
- Would be done at a plumber’s convenience since he has offered to do the labor at zero cost to the makerspace (would still have to pay for materials).
- Would most likely happen in October.
- Garden would like permission to pursue the hydrants pending funding being available.
Jewelry
- Would like to pursue moving the jewelry lab to room 1.
- Currently struggling to run classes with more than 2 people at a time given space and equipment limitations.
- An experienced jeweler has offered to donate more equipment that would aid in those classes.
- Safety considerations have been looked at for moving to room 1.
- The considerations have been shown that there should not be a limitation to move to room 1.
Upcoming Events
- Maker Monday
- 2nd and 4th Mondays
- Member Orientation
- Tuesday August 22nd @6pm
- Saturday September 9th @2:30pm
- Tuesday September 19th @6pm