Difference between revisions of "August 17th 2023"

From MakeICT Wiki
Jump to navigationJump to search
(→‎Thanks and Recognition: Edits for spelling, punctuation, formatting.)
Line 18: Line 18:
 
===Mission Statement===
 
===Mission Statement===
  
*MakeICT is a 501(c)(3) charitable organization and is operated entirely by volunteers. It’s our mission to innovate, learn, and build community at the intersection of art, technology, science, and culture.
+
*MakeICT is a 501(c)(3) charitable organization and is operated entirely by volunteers. It’s our mission to innovate, learn, and build community at the intersection of art, technology, science, and culture.<br />
 
 
  
 
===Thanks and Recognition===
 
===Thanks and Recognition===
  
 
*All the new leads for stepping up to the plate and doing an amazing job!
 
*All the new leads for stepping up to the plate and doing an amazing job!
*Ladeana and Malissa for there continued efforts to keep up with fundraising!
+
*Ladeana and Malissa for their continued efforts to keep up with fundraising!
 
 
  
 
==Old Business==
 
==Old Business==
 
===Surplus Auction===
 
===Surplus Auction===
  
*Still got a couple items in room 2 to move
+
*We still have a couple of items in room 2 to move.
 
**Should the items be pitched at this point?
 
**Should the items be pitched at this point?
  
 
===MakerFair - Exploration Place===
 
===MakerFair - Exploration Place===
  
*Rustin and John Harrison have been asked to lead up the ‘tinker corner’ of maker fair this year
+
*Rustin and John Harrison have been asked to lead up the "tinker corner" of maker fair this year
 
*Exploration Place came out to MakeICT on 7/10 to talk with members about how they can get involved
 
*Exploration Place came out to MakeICT on 7/10 to talk with members about how they can get involved
*Will most likely have 3 booths representing makeict might include demos making:
+
*Will most likely have 3 booths representing MakeICT might include demos making:
**foam hats
+
**Foam hats
*paint a rock
+
**Painted rocks
 
**LED stickers
 
**LED stickers
  
 
===Roof Funding===
 
===Roof Funding===
  
*Construction to begin mid-September and be completed by start of October
+
*Construction to begin mid-September, to be completed by start of October.
*Payment is not due until Construction is complete
+
*Payment is not due until construction is complete.
*Need to raise $38,000 to keep from digging into reserves
+
*Need to raise $38,000 to keep from digging into reserves.
 
*Currently raised: $500
 
*Currently raised: $500
*Have 2 grants in the works, but neither will pay before September
+
*Have two grants in the works, but neither will pay before September.
 
 
  
 
==New Business==
 
==New Business==
Line 61: Line 58:
  
 
*Please donate to the roof fund*
 
*Please donate to the roof fund*
 
  
 
===Approval of Previous Minutes===
 
===Approval of Previous Minutes===
Line 67: Line 63:
 
*6/29/2023 Minutes: https://wiki.makeict.org/wiki/June_29th_2023
 
*6/29/2023 Minutes: https://wiki.makeict.org/wiki/June_29th_2023
 
*7/20/2023 Minutes: https://wiki.makeict.org/wiki/July_12th_2023
 
*7/20/2023 Minutes: https://wiki.makeict.org/wiki/July_12th_2023
 
  
 
===Open Positions / Lead Changes===
 
===Open Positions / Lead Changes===
Line 79: Line 74:
 
**Fundraising -
 
**Fundraising -
 
*Inventory -
 
*Inventory -
 
  
 
===Board Positions===
 
===Board Positions===
Line 85: Line 79:
 
*3 Open Positions - VP, Secretary, Treasurer
 
*3 Open Positions - VP, Secretary, Treasurer
 
**Plan was to have a vote for VP, but now have 2 other positions open
 
**Plan was to have a vote for VP, but now have 2 other positions open
**Rustin and James are handling the Treasury work
+
**Rustin and James are handling the Treasury work.
**Gretchen is helping with the Secretary role
+
**Gretchen is helping with the Secretary role.
**Currently holding an election for VP
+
**Aaron Rivers won the election for VP.
 
**Should the other positions be elected or appointed?
 
**Should the other positions be elected or appointed?
***If appointed from existing board members, at large members would still need to be elected
+
***If appointed from existing board members, at-large members would still need to be elected.
*Sherry is interested in being Treasurer for the remainder of the term
+
*Sherry is interested in being Treasurer for the remainder of the term.
*Gretchen is interested in being Secretary for the remainder of the term
+
*Gretchen is interested in being Secretary for the remainder of the term.
 
 
  
 
===Policy Update - Building Access Policy===  
 
===Policy Update - Building Access Policy===  
Line 98: Line 91:
 
*Current policy does not cover the outdoor area of the makerspace.
 
*Current policy does not cover the outdoor area of the makerspace.
 
*Proposed change: https://docs.google.com/document/d/1tBEEEz5z66uAF2udLm2fNTH7P_MWy1cGIhGlE_KWvNg/edit?usp=sharing
 
*Proposed change: https://docs.google.com/document/d/1tBEEEz5z66uAF2udLm2fNTH7P_MWy1cGIhGlE_KWvNg/edit?usp=sharing
 
  
 
===How to contact board members or other leads===
 
===How to contact board members or other leads===
  
*through the years, different boards have had different preferences on how they are contacted
+
*Through the years, different boards have had different preferences on how they are contacted.
**past years have had a preference by facebook or text
+
**The past years there has been a preference for Facebook or text.
**the current preference is by the appropriate email
+
**The current preference is by the appropriate email:
*** directors@makeict.org, metalshop@makeict.org, woodshop@makeict.org, info@makeict.org etc
+
***directors@makeict.org
 +
***metalshop@makeict.org
 +
***woodshop@makeict.org
 +
***info@makeict.org  
 +
***etc
  
 +
===Code of Conduct Reporting Committee===
  
===Code of Conduct Reporting Committee===
+
*Requesting to change their name to something less confusing - Dispute Resolution Committee (DRC)
 +
*Presenting recommendations to the board.
  
*1. Requesting to change their name to something less confusion -Dispute Resolution Committee (DRC)
 
*2. Review determination reports
 
 
**May require executive session
 
**May require executive session
  
Line 121: Line 117:
 
*Majority of funds in garden were spent at the start of the year
 
*Majority of funds in garden were spent at the start of the year
 
*Do not have a current exact estimate for cost, but current cost would require a 3rd party to dig under utilities  
 
*Do not have a current exact estimate for cost, but current cost would require a 3rd party to dig under utilities  
**Ballpark cost would be about $1500
+
**Ballpark cost would be about $1500.
**Would be done at a plumber’s convenience since he has offered to do the labor at zero cost to the makerspace (would still have to pay for materials)
+
**Would be done at a plumber’s convenience since he has offered to do the labor at zero cost to the makerspace (would still have to pay for materials).
**Would most likely happen in October
+
**Would most likely happen in October.
**Garden would like permission to pursue the hydrants pending funding being available
+
**Garden would like permission to pursue the hydrants pending funding being available.
 
 
  
 
===Jewelry===
 
===Jewelry===
  
*Would like to pursue moving the jewelry lab to room 1
+
*Would like to pursue moving the jewelry lab to room 1.
*Currently struggling to run classes with more than 2 people at a time given space and equipment limitations
+
*Currently struggling to run classes with more than 2 people at a time given space and equipment limitations.
*An experienced jeweler has offered to donate more equipment that would aid in those classes
+
*An experienced jeweler has offered to donate more equipment that would aid in those classes.
*Safety considerations have been looked at for moving to room 1
+
*Safety considerations have been looked at for moving to room 1.
**The considerations have been shown that there should not be a limitation to move to room  1
+
**The considerations have been shown that there should not be a limitation to move to room  1.
 
 
  
 
==Upcoming Events==
 
==Upcoming Events==
Line 140: Line 134:
 
*'''Maker Monday'''
 
*'''Maker Monday'''
 
**2nd and 4th Mondays
 
**2nd and 4th Mondays
 
  
 
*'''Member Orientation'''
 
*'''Member Orientation'''
 
**Tuesday August 22nd @6pm
 
**Tuesday August 22nd @6pm
 
**Saturday September 9th @2:30pm
 
**Saturday September 9th @2:30pm
**Tuesday September 19th @6pm
+
**Tuesday September 19th @6pm<br />
 
 
  
 
==Decision Summary==
 
==Decision Summary==

Revision as of 21:19, 15 August 2023

AGENDA

Attendance

Board Members

  • Rustin Atkeisson, President
  • TBD, Vice President
  • TBD, Treasurer
  • TBD, Secretary
  • James Lancaster, At-Large
  • LaDeana Dockery, At-Large
  • Gretchen Koch, At-Large
  • Michael Atherton, At-Large

Absent

Members

Mission Statement

  • MakeICT is a 501(c)(3) charitable organization and is operated entirely by volunteers. It’s our mission to innovate, learn, and build community at the intersection of art, technology, science, and culture.

Thanks and Recognition

  • All the new leads for stepping up to the plate and doing an amazing job!
  • Ladeana and Malissa for their continued efforts to keep up with fundraising!

Old Business

Surplus Auction

  • We still have a couple of items in room 2 to move.
    • Should the items be pitched at this point?

MakerFair - Exploration Place

  • Rustin and John Harrison have been asked to lead up the "tinker corner" of maker fair this year
  • Exploration Place came out to MakeICT on 7/10 to talk with members about how they can get involved
  • Will most likely have 3 booths representing MakeICT might include demos making:
    • Foam hats
    • Painted rocks
    • LED stickers

Roof Funding

  • Construction to begin mid-September, to be completed by start of October.
  • Payment is not due until construction is complete.
  • Need to raise $38,000 to keep from digging into reserves.
  • Currently raised: $500
  • Have two grants in the works, but neither will pay before September.

New Business

Treasurer’s Report

Income $ , above or below budget Utilities insight Instructor pay $ Shop expenses $ Total expenses $ , above or below budget Positive or negative for the month

  • Please donate to the roof fund*

Approval of Previous Minutes

Open Positions / Lead Changes

  • Several positions have recently been vacated and we need to find people willing to support these positions
  • Positions include and suggested leads
    • Visual Arts - (Kim Nguyen interim)
    • Textiles - June Huie, as lead & Rayna Fisher, as co-lead
    • Jewelry - (Michael Atherton interim)
    • Communications -
    • Fundraising -
  • Inventory -

Board Positions

  • 3 Open Positions - VP, Secretary, Treasurer
    • Plan was to have a vote for VP, but now have 2 other positions open
    • Rustin and James are handling the Treasury work.
    • Gretchen is helping with the Secretary role.
    • Aaron Rivers won the election for VP.
    • Should the other positions be elected or appointed?
      • If appointed from existing board members, at-large members would still need to be elected.
  • Sherry is interested in being Treasurer for the remainder of the term.
  • Gretchen is interested in being Secretary for the remainder of the term.

Policy Update - Building Access Policy

How to contact board members or other leads

  • Through the years, different boards have had different preferences on how they are contacted.
    • The past years there has been a preference for Facebook or text.
    • The current preference is by the appropriate email:
      • directors@makeict.org
      • metalshop@makeict.org
      • woodshop@makeict.org
      • info@makeict.org
      • etc

Code of Conduct Reporting Committee

  • Requesting to change their name to something less confusing - Dispute Resolution Committee (DRC)
  • Presenting recommendations to the board.

**May require executive session


Committee Reports

Garden Area

  • Would like a hydrant added to the garden area
  • Majority of funds in garden were spent at the start of the year
  • Do not have a current exact estimate for cost, but current cost would require a 3rd party to dig under utilities
    • Ballpark cost would be about $1500.
    • Would be done at a plumber’s convenience since he has offered to do the labor at zero cost to the makerspace (would still have to pay for materials).
    • Would most likely happen in October.
    • Garden would like permission to pursue the hydrants pending funding being available.

Jewelry

  • Would like to pursue moving the jewelry lab to room 1.
  • Currently struggling to run classes with more than 2 people at a time given space and equipment limitations.
  • An experienced jeweler has offered to donate more equipment that would aid in those classes.
  • Safety considerations have been looked at for moving to room 1.
    • The considerations have been shown that there should not be a limitation to move to room 1.

Upcoming Events

  • Maker Monday
    • 2nd and 4th Mondays
  • Member Orientation
    • Tuesday August 22nd @6pm
    • Saturday September 9th @2:30pm
    • Tuesday September 19th @6pm

Decision Summary

    Task Summary