August 17th 2023

From MakeICT Wiki
Revision as of 11:52, 12 August 2023 by Rustin Atkeisson (talk | contribs)
Jump to navigationJump to search

AGENDA

Attendance

Board Members

  • Rustin Atkeisson, President
  • TBD, Vice President
  • TBD, Treasurer
  • TBD, Secretary
  • James Lancaster, At-Large
  • LaDeana Dockery, At-Large
  • Gretchen Koch, At-Large
  • Michael Atherton, At-Large

Absent

Members

Mission Statement

  • MakeICT is a 501(c)(3) charitable organization and is operated entirely by volunteers. It’s our mission to innovate, learn, and build community at the intersection of art, technology, science, and culture.


Thanks and Recognition

  • All the new leads for stepping up to the plate and doing an amazing job!
  • Ladeana and Malissa for there continued efforts to keep up with fundraising!


Old Business

Surplus Auction

  • Still got a couple items in room 2 to move
    • Should the items be pitched at this point?

MakerFair - Exploration Place

  • Rustin and John Harrison have been asked to lead up the ‘tinker corner’ of maker fair this year
  • Exploration Place came out to MakeICT on 7/10 to talk with members about how they can get involved
  • Will most likely have 3 booths representing makeict might include demos making:
    • foam hats
  • paint a rock
    • LED stickers

Roof Funding

  • Construction to begin mid-September and be completed by start of October
  • Payment is not due until Construction is complete
  • Need to raise $38,000 to keep from digging into reserves
  • Currently raised: $500
  • Have 2 grants in the works, but neither will pay before September


New Business

Treasurer’s Report

Income $ , above or below budget Utilities insight Instructor pay $ Shop expenses $ Total expenses $ , above or below budget Positive or negative for the month

  • Please donate to the roof fund*


Approval of Previous Minutes


Open Positions / Lead Changes

  • Several positions have recently been vacated and we need to find people willing to support these positions
  • Positions include and suggested leads
    • Visual Arts - (Kim Nguyen interim)
    • Textiles - June Huie, as lead & Rayna Fisher, as co-lead
    • Jewelry - (Michael Atherton interim)
    • Communications -
    • Fundraising -
  • Inventory -


Board Positions

  • 3 Open Positions - VP, Secretary, Treasurer
    • Plan was to have a vote for VP, but now have 2 other positions open
    • Rustin and James are handling the Treasury work
    • Gretchen is helping with the Secretary role
    • Currently holding an election for VP
    • Should the other positions be elected or appointed?
      • If appointed from existing board members, at large members would still need to be elected
  • Sherry is interested in being Treasurer for the remainder of the term
  • Gretchen is interested in being Secretary for the remainder of the term


Policy Update - Building Access Policy


How to contact board members or other leads

  • through the years, different boards have had different preferences on how they are contacted
    • past years have had a preference by facebook or text
    • the current preference is by the appropriate email
      • directors@makeict.org, metalshop@makeict.org, woodshop@makeict.org, info@makeict.org etc


Code of Conduct Reporting Committee

  • 1. Requesting to change their name to something less confusion -Dispute Resolution Committee (DRC)
  • 2. Review determination reports

**May require executive session


Committee Reports

Garden Area

  • Would like a hydrant added to the garden area
  • Majority of funds in garden were spent at the start of the year
  • Do not have a current exact estimate for cost, but current cost would require a 3rd party to dig under utilities
    • Ballpark cost would be about $1500
    • Would be done at a plumber’s convenience since he has offered to do the labor at zero cost to the makerspace (would still have to pay for materials)
    • Would most likely happen in October
    • Garden would like permission to pursue the hydrants pending funding being available


Jewelry

  • Would like to pursue moving the jewelry lab to room 1
  • Currently struggling to run classes with more than 2 people at a time given space and equipment limitations
  • An experienced jeweler has offered to donate more equipment that would aid in those classes
  • Safety considerations have been looked at for moving to room 1
    • The considerations have been shown that there should not be a limitation to move to room 1


Upcoming Events

  • Maker Monday
    • 2nd and 4th Mondays


  • Member Orientation
    • Tuesday August 22nd @6pm
    • Saturday September 9th @2:30pm
    • Tuesday September 19th @6pm


Decision Summary

    Task Summary